This amazing residence is located 600 meters away from the sea and within walking distance to the markets, restaurants, banks, and shopping centers.
Construction will begin in September 2021 and will end on 03/03/2023.
Installment Plan: %40 Cash, the rest can be made in installment until March 2023.
In the 12-story residential complex are planned 120 apartments of various types, which open the doors of prestigious life thanks to their social facilities, which will ensure comfortable and qualitative life for the owners at the highest level.
Аpartments types:
1 + 1 = 49-55 m2
2 + 1 = 73 m2
Duplex = 101-209 m2
Complex infrastructure:
Apartments facilities: